How To Install Shingles On A Shed

 The roof shingles is the popular roof when it comes to roofing a shed.  When the shingles are used, it will lead to an attractive and interesting appearance, while at the same time, the roof will be durable.  It will not be difficult for shed roof flashing compared to the mineral roofing felt that had been common roofing materials on the sheds for a long period.

Before you start with shed shingles layering, you have to ensure that the shed frame looks square and it is level up, before you start with the roof construction. When the beams are put in the place, they should be covered by 12mm of the exterior grade plywood sheathing.  You have to ensure that you use the exterior plywood since it will be moisture resistant and it may wrap if it is exposed to the outside condition.

One of the steps to shingle a roof, is the plywood sheathing will be laid using the grain of plywood which is perpendicular of the roof rafters.  When the sheathing has been layed in such way, it will ensure that it creates the sound structure.

Use the chalk line in order to mark every plywood sheet, snapping of the line that will mark where the rafter beam should be.  Keeping in with the local guidelines, the nail sheathing of the rafter beam will be using 2 inches of galvanized nails.  There are local guidelines which will suggest nailing the sheathing of a rafter beam with 4 or 6 inches, but the requirement will be different from the local weather condition like snow loads, tornadoes and hurricanes.

See also  How to Flush a Clogged Radiator the Quick & Best Way

Install Shingles On A Shed

Do you need underlay for shed roof?

The roofing underlay can also be called 30 pound felt paper or tar paper. It is important when it comes to putting a roof on a shed.  It is a layer which will create the watertight barrier.  An underlay can last six month or even less when it is left at the outside elements.  The underlay will provide the secondary and the backup waterproof layer in order to stop the water which will make it through an overlapping shingles at the top.

Start at a bottom of a side of a roof and use the underlay horizontally, over the entire top roof.  This is what it is called often as the cap nails, green head or red head. They can be used in attaching a felt over the plywood since such nails do have a large nail head and a small tack at its middle.  This means that it will not tear or rip away this felt.

While doing diy shed roofing, each nail should be put after 6 inches up to 1 foot.  When the first row had been laid and it is attached, you can use a second layer of the felt which will be moving up to a peak.  A second layer of a felt, it has to overlap   with 6 inches. This should have been pre-market at the felt; this means that the builder will have the clear guide in assisting of the lining up of the sheets.

You should continue with shed roof installation with laying the felt and to secure the caps using the nails.  The two sides for the roof have to be completed and you can place a final sheet at the roof peak.  The sheet has to be added at least to make sure that the water will drain away of the roof peak. The seam will face down to the ground.

See also  How To Remove Scratches From A Windshield (7 Methods)

How do you lay shingles for beginners?

If the roof had already been covered using the underlay, it will be the right time of attaching asphalt.  The least expensive shingle last up to 20 years.   It is a type of a shingle which will be sufficient as shed roof shingles.  However, if you wish, you can go for 25 year shingle or 30 year shingle.  The 30 year shingles will look thick and they will make the roof to look as if it is a 3 dimensional.  In case you wish that the shed will match how the main house looks, you should use thicker choice that will add the dimensional shingle.  Thicker shingle can increase durability of a roof and it will add the resistance if you live in the area of high wind.

You have to make sure that the felt roof shingles is water fight and it can eliminate the wind infiltration.  At first, you have to place the tar at the edge bottom of a roof and then lay row the shingles at upside down, until the bottom of a roof.

You have to be careful when it comes to applying the tar since it can ooze out of a building, when you start installing roof shingles on shed. It will be easier if you avoid any tar drip instead of having to clean the tar off.

When you finish with the upside down shingles on the roof using tar, you should start laying the shingles.  You should begin on a bottom corner. You can then lay first shingles at the top and then affix it using tar.  Nail a new shingle using a roofing nail. Depending on building code in the area, the shingle will need 4-6 nails at each section of a shingle.

See also  How To Remove Tile

After finishing the two side of a roof, you should add the shingle at the roof ridge. The shed roof drip edge is an important piece which can protect a roof peak against the water penetration.

How do you shingle the peak of a shed?  

The shed roof is the one that will be having the single sloping side and it requires installing drip edge on shed. If shingling the shed using the three tap shingle, (the tar backed shingle, asphalt covered and the standard which are common on the residential roofs). You can reach a point at which, a top row has to get finished using a new type of the shingle or ridge cap shingle.  The ridge cap shingle look square and they have to be layered starting from a top edge or ridge, of a shed roof.

Know where you have to stop adding the tree tab shingles and then switch to the ridge caps.

 

Leave a Comment